Owner | Grand Valley Wind LP, a Limited Partnership of Veresen Inc. and Greta Energy Inc. |
Project | Grand Valley Wind Project Phase I and II |
Location | North of Grand Valley, Ontario |
Size | 19.8 MW |
Turbines | 9 Siemens 2.3 MW, 80m hub height |
Role | Project Management and Construction Monitoring |
The project involved the management of the supply and installation of 9 Siemens SWT 2.3-101 MW turbines. The site is located in the township of East Luther Grand Valley in the county of Dufferin.
Final permitting and tendering of the EPC contract took place in late-2010 and early 2011. Construction started with roads and turbine foundations in August and turbines were delivered in November. The project phases both came on-line with commercial operation in March, 2012.
CPL worked with Veresen through the permitting and tendering phase. A project manager and a full-time on-site construction monitor were engaged throughout the construction phase on management of project scheduling, cost control, municipal/county and landowner communication, and logistics between the contractors and turbine supplier.
The project was completed on schedule and on budget.
Key Features:
- Siemens SWT-2.3-101 MW with 80m hub height.
- Rotor/blade diameter of 101m.
- Approximately 6 km of site access roads.
- Approximately 28 km of 34.5 kV and 44 kV underground power & communication lines.
- New 44 kV substation.
- COD in March 2012.